1.5MW Data Centre Upgrade
MiCiM were appointed by a major international data centre operator as the main contractor to carry out a 1.5MW upgrade on the ground floor of a live two-storey datacentre site in Slough, the UK’s foremost datacentre hub. Completed in 2025, this represents the final phase of this 11,000+m² colocation facility.

400KW Edge Data Centre
MiCiM acted as principal contractors for BSH09 – part of Boldyn’s national Edge programme and one of the Base Station Hotels (BSHs) delivering critical connectivity across London.

Centersquare’s Liquid Cooling Showcase LHR3
MiCiM were tapped to consult on and project manage the conversion of unused space at Centersquare’s LHR3 Reading data centre into a...

Oxford Instruments Plasma Technology
The new facility located in Bristol UK will include ISO level 5 class application laboratories spanning...

Chilled Water Upgrade Validation Engineer Appointment, Hampshire
Our client required comprehensive commissioning management to ensure that the fit-out phases of their live facility were delivered fully in line with the design intent. This required a commissioning approach that carefully controlled risk while integrating new systems with those installed during Phase 1.

Commissioning Management Data Centre Fit Out, Essex
Our client required comprehensive commissioning management to ensure that the fit-out phases of their live facility were delivered fully in line with the design intent. This required a commissioning approach that carefully controlled risk while integrating new systems with those installed during Phase 1.

Legacy Data Center Energy Efficiency Upgrade
Our client was a global financial services enterprise operating a network of high availability data centers. This project focused on one of its major facilities located in Greater London, UK.

Entel Chile
Through a series of workshops, facilitated by Operational Intelligence (now part of MiCiM), Entel Chile was able to make improvements at various operational data centre facilities

Dublin Data Centres Risk & Energy Reduction Programme
Our client operated a portfolio of Tier III data centres located in Dublin, Ireland, each providing multi‑megawatt IT capacity supported by air‑side free cooling systems.

LHR1-B Phase 2
The project consists of amendments to the interior ground floor of LHR1-B building, to convert existing storage space to...