1.5MW Data Centre Upgrade

MiCiM were appointed by a major international data centre operator as the main contractor to carry out a 1.5MW upgrade on the ground floor of a live two-storey datacentre site in Slough, the UK’s foremost datacentre hub. Completed in 2025, this represents the final phase of this 11,000+m² colocation facility.

400KW Edge Data Centre

MiCiM acted as principal contractors for BSH09 – part of Boldyn’s national Edge programme and one of the Base Station Hotels (BSHs) delivering critical connectivity across London.

Chilled Water Upgrade Validation Engineer Appointment, Hampshire

Our client required comprehensive commissioning management to ensure that the fit-out phases of their live facility were delivered fully in line with the design intent. This required a commissioning approach that carefully controlled risk while integrating new systems with those installed during Phase 1.

Commissioning Management Data Centre Fit Out, Essex

Our client required comprehensive commissioning management to ensure that the fit-out phases of their live facility were delivered fully in line with the design intent. This required a commissioning approach that carefully controlled risk while integrating new systems with those installed during Phase 1.

LHR1-B Phase 2

The project consists of amendments to the interior ground floor of LHR1-B building, to convert existing storage space to...

Campus Dub 4

Dublin 4 phase included the entire campus infrastructure & services together with the construction of...

K2 Data Centre Dublin 1

Data Centre Power Station Project

With the lack of power availability in Ireland this innovative project will be the first data centre with no grid connection to be powered by in-house gas and HVO generators with a large Battery Energy Storage System which provides the basis for the grid.