
1.5MW Data Centre Upgrade
MiCiM were appointed by a major international data centre operator as the main contractor to carry out a 1.5MW upgrade on the ground floor of a live two-storey datacentre site in Slough, the UK’s foremost datacentre hub. Completed in 2025, this represents the final phase of this 11,000+m² colocation facility.

400KW Edge Data Centre
MiCiM acted as principal contractors for BSH09 – part of Boldyn’s national Edge programme and one of the Base Station Hotels (BSHs) delivering critical connectivity across London.

LHR1-B Phase 2
The project consists of amendments to the interior ground floor of LHR1-B building, to convert existing storage space to...

Oxford Instruments Plasma Technology
The new facility located in Bristol UK will include ISO level 5 class application laboratories spanning...

LHR1-B
The LHR1-B project included the construction of a new switchroom incorporating 4no. IT power...

RTL Ultra-Capacitor Modulator
MiCiM partnered with AVK on this project, by the highly innovative energy technology company...

One Angel Court London
MiCiM were Principle Contractor as a turn key package with a well known generator contractor.
https://micimgroup.com/wp-content/uploads/2025/01/west-london-datacentre-experience-photo-1.jpg
675
900
Alison Newell
/wp-content/uploads/2025/01/MiCiM.svg
Alison Newell2025-01-23 16:30:372025-03-04 15:39:14Powergate Data Centre
















