/wp-content/uploads/2025/01/MiCiM.svg
0
0
Steven Pease
/wp-content/uploads/2025/01/MiCiM.svg
Steven Pease2025-11-27 10:38:192025-11-27 10:38:21Design Manager – UK/Europe
/wp-content/uploads/2025/01/MiCiM.svg
0
0
Steven Pease
/wp-content/uploads/2025/01/MiCiM.svg
Steven Pease2025-11-27 10:30:122025-11-27 10:30:15MEP Manager – Norway
/wp-content/uploads/2025/01/MiCiM.svg
0
0
Steven Pease
/wp-content/uploads/2025/01/MiCiM.svg
Steven Pease2025-11-27 10:27:492025-11-27 10:27:52Design Manager – Norway
/wp-content/uploads/2025/01/MiCiM.svg
0
0
Steven Pease
/wp-content/uploads/2025/01/MiCiM.svg
Steven Pease2025-11-27 10:25:192025-11-27 10:25:23Health & Safety Manager – Norway
/wp-content/uploads/2025/01/MiCiM.svg
0
0
Steven Pease
/wp-content/uploads/2025/01/MiCiM.svg
Steven Pease2025-11-27 10:19:222025-11-27 10:19:25Project Manager, data centre construction – Norway
/wp-content/uploads/2025/01/MiCiM.svg
0
0
Steven Pease
/wp-content/uploads/2025/01/MiCiM.svg
Steven Pease2025-11-27 10:03:522025-11-27 10:03:54Assistant Project Manager – UK South East
1.5MW Data Centre Upgrade
MiCiM were appointed by a major international data centre operator as the main contractor to carry out a 1.5MW upgrade on the ground floor of a live two-storey datacentre site in Slough, the UK’s foremost datacentre hub. Completed in 2025, this represents the final phase of this 11,000+m² colocation facility.

400KW Edge Data Centre
MiCiM acted as principal contractors for BSH09 – part of Boldyn’s national Edge programme and one of the Base Station Hotels (BSHs) delivering critical connectivity across London.
















